nome do projeto

METRO began the project for a new Casa Triângulo by collaborating with their clients on an extensive search for a site suitable for one of Brazil’s most important contemporary art galleries, which has already been in operation for 28 years. This partnership ensured that that the property on Rua Estados Unidos (one of Sao Paulo’s most distinctive streets) was not simply chosen based on its physical location, but was also selected for the characteristics of an existing structure that would allow for a rapid conversion into a substantial exhibition space. The resultant gap between design and construction was just 11 months.

15 1

nome do projeto

The new building is conceived as a single large volume, housing two exhibition areas, the collection’s storage, administration and support areas totalling approximately 500sqm spread over three levels (ground, mezzanine and first floors). At almost 5m, the height of the main exhibition area is equivalent to that of the Sao Paulo’s Biennale Pavillion, making the new Casa Triângulo one of the few galleries in town with proportions of this scale.

03 2

01 2

04 1

nome do projeto

22

19 1

215 DV DP 001 215 DV DP 002

12 1

215 DV FO ME 030

20 1

13 1

14 1

nome do projeto

nome do projeto

Regarding the external areas, the façade facing onto Rua Cristóvão Diniz – less exposed to flows of traffic than Estados Unidos – is defined by a courtyard demarcated by the extension of the concrete flooring of the gallery and at its length by a pre-cast concrete bench. This helps suggest a public character conducive to both event days and the daily use of pedestrians. This is complemented by a second asphalt and gravel area which may be used for loading and unloading works of art, but also activated as additional external event space. The area fronting Rua Estados Unidos is reserved for general-access parking. Translucent polycarbonate panels form the entire perimeter of the gallery allowing for natural lighting and transparency during the day, whilst in reverse, transmitting it at night. Large pivoting openings found within these continuous panels, reinforce the permeability between interior and exterior. Materials have been selected for their efficiency at the detailing stage, either because they were prefabricated or did not require excessive finishing during construction. The polycarbonate and cement panels used on the external facade and in the lining of the main exhibition area, together with the expanded steel grills covering the ceiling, are examples of such materials.

nome do projeto

nome do projeto

23

technical information

Project Start: March 2015
Project Completion: January 2016
Address: Rua Estados Unidos, 1324, São Paulo
Footprint: 
Total Construction Area: 450 m²
Architectural Project: Martin Corullon, Gustavo Cedroni, Helena Cavalheiro, Marina Ioshii, Renata Mori, Luis Tavares, Isadora Marchi, Rafael de Sousa, Juliana Ziebell, Gabriela Santana, Marina Pereira
Structural prospecting: Marcondes Ferraz Engenharia
Structural Design: INNER Engenharia e Gerenciamento
Service Design: L2C Engenharia
Lighting: Design da Luz | Fernanda Carvalho
Landscaping: Bonsai Paisagismo
Contractor: Lock Engenharia
Photos: Leonardo Finotti