The development of the executive architecture project for the largest aircraft maintenance center in Brazil focused on coordinating the designs and projects of 14 specialist teams into a technically coherent set, within a determined budget and a total timeframe of 180 days. It consists of an administrative building with 11,000 m² and two hangars, one with an 80-meter span for the maintenance of two aircraft simultaneously, and another with a 40-meter span, equipped with exhaust and filtration systems for fuselage painting, as well as a concrete maneuvering yard.

02

04

03

05

06

07

09

10

11

12

13

14

Technical Specification

Project Type Airplane Hangar
Project Start 2005
Project Completion 2006
Address Confins, MG
Land Area 21,900 m²
Built Area 18,500 m²
Architecture: Martin Corullon, Anna Ferrari, Gustavo Cedroni, Carolina Castro, César Laudanna Patricio, Veit Grundmann, Vania T. Coutinho [Consulting]
Client Gol
Construction Método Engenharia
Engineering Consulting FBN Consultoria de Engenharia
Lighting Design Godoy e Associados Iluminação
Foundations and Earthworks Geobrax Engenharia
Acoustics Sresnewsky Engenharia
Metallic Structure Medabil Varco – Pruden
Concrete Structure Design Modus Engenharia de Estruturas
Flooring Design LPE Engenharia e Consultoria
Electrical and Plumbing Installations Interativa Engenharia
Automation HOS
Air Conditioning Teknika Projetos e Consultoria
Landscaping Helena Justo
Visual Communication Cássia Buitoni
Photography Leonardo Finotti