{"id":5435,"date":"2017-10-02T14:39:58","date_gmt":"2017-10-02T17:39:58","guid":{"rendered":"https:\/\/metroarquitetos.com.br\/imaflora-piracicaba-2012\/"},"modified":"2024-11-22T12:08:30","modified_gmt":"2024-11-22T15:08:30","slug":"imaflora-piracicaba-2012","status":"publish","type":"post","link":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/","title":{"rendered":"imaflora, piracicaba, 2012"},"content":{"rendered":"<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13202\" title=\"001\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg\" alt=\"001\" width=\"2560\" height=\"1646\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-600x386.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-750x482.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-1120x720.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-768x494.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-1536x988.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-2048x1317.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-500x322.jpg 500w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p>Project for a multipurpose auditorium for the Institute of Forest and Agricultural Management and Certification &#8211; Imaflora. The program consists of the construction of a new pavilion at the company&#8217;s headquarters in Piracicaba, which includes an auditorium with varying capacities, meeting rooms, and a caf\u00e9. The proposal was to organize the program within a base of exposed concrete: in the center, the auditorium with retractable bleachers allowing for multiple configurations, the reception at one end, and the caf\u00e9 at the other, with meeting rooms on the first floor. The roof consists of a structure of laminated wood frames that filter light differently in each of the spaces it encompasses.<\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13204\" title=\"002\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-scaled.jpg\" alt=\"002\" width=\"2560\" height=\"2197\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-600x515.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-750x644.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-1120x961.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-768x659.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-1536x1318.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-2048x1757.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/002-500x429.jpg 500w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13206\" title=\"003\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003.jpg\" alt=\"003\" width=\"1500\" height=\"860\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003.jpg 1500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-600x344.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-750x430.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-1120x642.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-768x440.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-500x287.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/003-700x400.jpg 700w\" sizes=\"auto, (max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13209\" title=\"004\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-scaled.jpg\" alt=\"004\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-600x450.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-750x563.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-1120x840.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-768x576.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-1536x1152.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-2048x1536.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-500x375.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/004-800x600.jpg 800w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13211 size-full\" title=\"005\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854.jpg\" alt=\"005\" width=\"2560\" height=\"652\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-600x153.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-750x191.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-1120x285.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-768x196.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-1536x391.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-2048x522.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/005-scaled-e1712601432854-500x127.jpg 500w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13215 size-full\" title=\"007\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206.jpg\" alt=\"007\" width=\"2521\" height=\"1651\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206.jpg 2521w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-600x393.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-750x491.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-1120x733.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-768x503.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-1536x1006.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-2048x1341.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/007-scaled-e1712601545206-500x327.jpg 500w\" sizes=\"auto, (max-width: 2521px) 100vw, 2521px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13217\" title=\"008\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-scaled.jpg\" alt=\"008\" width=\"2560\" height=\"1459\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-600x342.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-750x428.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-1120x638.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-768x438.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-1536x876.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-2048x1167.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-500x285.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/008-700x400.jpg 700w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13219\" title=\"009\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-scaled.jpg\" alt=\"009\" width=\"2560\" height=\"2197\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-600x515.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-750x644.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-1120x961.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-768x659.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-1536x1318.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-2048x1757.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/009-500x429.jpg 500w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-13221 size-full\" title=\"010\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828.jpg\" alt=\"010\" width=\"2560\" height=\"1088\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-600x255.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-750x319.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-1120x476.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-768x326.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-1536x653.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-2048x870.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/010-scaled-e1712601664828-500x213.jpg 500w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13223\" title=\"011\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-scaled.jpg\" alt=\"011\" width=\"2560\" height=\"1459\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-600x342.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-750x428.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-1120x638.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-768x438.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-1536x876.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-2048x1167.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-500x285.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/011-700x400.jpg 700w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13225\" title=\"012\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-scaled.jpg\" alt=\"012\" width=\"2560\" height=\"1466\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-600x344.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-750x429.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-1120x641.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-768x440.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-1536x880.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-2048x1173.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-500x286.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/012-700x400.jpg 700w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13227\" title=\"013\" src=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-scaled.jpg\" alt=\"013\" width=\"2560\" height=\"1468\" srcset=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-scaled.jpg 2560w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-600x344.jpg 600w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-750x430.jpg 750w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-1120x642.jpg 1120w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-768x440.jpg 768w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-1536x881.jpg 1536w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-2048x1174.jpg 2048w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-500x287.jpg 500w, https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/013-700x400.jpg 700w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<div class=\"flex-shrink-0 flex flex-col relative items-end\">\n<div>\n<div class=\"pt-0\">\n<div class=\"gizmo-bot-avatar flex h-8 w-8 items-center justify-center overflow-hidden rounded-full\">\n<div class=\"relative p-1 rounded-sm flex items-center justify-center bg-token-main-surface-primary text-token-text-primary h-8 w-8\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn\">\n<div class=\"flex-col gap-1 md:gap-3\">\n<div class=\"flex max-w-full flex-col flex-grow\">\n<div class=\"min-h-8 text-message flex w-full flex-col items-end gap-2 whitespace-normal break-words [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"5a2467a7-0f42-46a9-b821-07a8d389a80e\" data-client-thread-id=\"WEB:252a49c0-9ff6-4192-accf-9e9c9af9790d\" data-message-model-slug=\"gpt-4o\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose w-full break-words dark:prose-invert light\">\n<p><strong>Technical Specification<\/strong><\/p>\n<p><strong>Project Type<\/strong> Multi-use Auditorium<br \/>\n<strong>Project Start<\/strong> 2012<br \/>\n<strong>Address<\/strong> Piracicaba, SP<br \/>\n<strong>Land Area<\/strong> 750 m\u00b2<br \/>\n<strong>Total Built Area<\/strong> 3,505 m\u00b2<br \/>\n<strong>Architecture and Interior Design<\/strong> Gustavo Cedroni, Martin Corullon, Anna Ferrari, Bruno Jin Young Kim, Filipe Barrocas, Flavio A. D. Bragaia, Francisca Lopes, Isadora Marchi, Luis Tavares, Marcelo E. M. Macedo, Marina Ioshii, Rafael de Sousa Silva<br \/>\n<strong>Structural Engineering<\/strong> Ita Construtora, Eng. H\u00e9lio Olga<br \/>\n<strong>Electrical Engineering<\/strong> PKM, Walter T. Oda Jr.<br \/>\n<strong>Plumbing<\/strong> Usina, Juliana Martimbianco<br \/>\n<strong>Air Conditioning<\/strong> Termodatta, Luis Guilherme B. Santos<br \/>\n<strong>Acoustics<\/strong> Harmonia, Marcos Holtz<br \/>\n<strong>Client<\/strong> Instituto de Manejo e Certifica\u00e7\u00e3o Ambiental e Agr\u00edcola &#8211; Imaflora<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Project for a multipurpose auditorium for the Institute of Forest and Agricultural Management and Certification &#8211; Imaflora. The program consists of the construction of a new pavilion at the company&#8217;s headquarters in Piracicaba, which includes an auditorium with varying capacities, meeting rooms, and a caf\u00e9. The proposal was to organize the program within a base&#8230;<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[48],"tags":[419,420,383,411,354],"class_list":["post-5435","post","type-post","status-publish","format-standard","hentry","category-project","tag-america-do-sul-en","tag-brasil-en","tag-institutional","tag-piracicaba-en","tag-unbuilt"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>imaflora, piracicaba, 2012 - Metro Arquitetos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"imaflora, piracicaba, 2012 - Metro Arquitetos\" \/>\n<meta property=\"og:description\" content=\"Project for a multipurpose auditorium for the Institute of Forest and Agricultural Management and Certification &#8211; Imaflora. The program consists of the construction of a new pavilion at the company&#8217;s headquarters in Piracicaba, which includes an auditorium with varying capacities, meeting rooms, and a caf\u00e9. The proposal was to organize the program within a base...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/\" \/>\n<meta property=\"og:site_name\" content=\"Metro Arquitetos\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/metroarquitetos\" \/>\n<meta property=\"article:published_time\" content=\"2017-10-02T17:39:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-22T15:08:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg\" \/>\n<meta name=\"author\" content=\"Stella\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Stella\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/\"},\"author\":{\"name\":\"Stella\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#\\\/schema\\\/person\\\/018f0868a3775ee733a63ebd0eb69cd1\"},\"headline\":\"imaflora, piracicaba, 2012\",\"datePublished\":\"2017-10-02T17:39:58+00:00\",\"dateModified\":\"2024-11-22T15:08:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/\"},\"wordCount\":209,\"publisher\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/001-scaled.jpg\",\"keywords\":[\"am\u00e9rica do sul\",\"brasil\",\"institutional\",\"piracicaba\",\"unbuilt\"],\"articleSection\":[\"Project\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/\",\"url\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/\",\"name\":\"imaflora, piracicaba, 2012 - Metro Arquitetos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/001-scaled.jpg\",\"datePublished\":\"2017-10-02T17:39:58+00:00\",\"dateModified\":\"2024-11-22T15:08:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/001-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/001-scaled.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/project\\\/imaflora-piracicaba-2012\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"imaflora, piracicaba, 2012\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/\",\"name\":\"Metro Arquitetos\",\"description\":\"Metro Arquitetos Associados \u00e9 um escrit\u00f3rio de arquitetura que desenvolve projetos em diversas escalas, de instala\u00e7\u00f5es tempor\u00e1rias a interven\u00e7\u00f5es urbanas.\",\"publisher\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#organization\",\"name\":\"Metro Arquitetos\",\"url\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logotipo-metro_01.png\",\"contentUrl\":\"https:\\\/\\\/metroarquitetos.com.br\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logotipo-metro_01.png\",\"width\":133,\"height\":35,\"caption\":\"Metro Arquitetos\"},\"image\":{\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/metroarquitetos\",\"https:\\\/\\\/www.instagram.com\\\/metroarquitetos\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/metro-arquitetos-associados\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/metroarquitetos.com.br\\\/en\\\/#\\\/schema\\\/person\\\/018f0868a3775ee733a63ebd0eb69cd1\",\"name\":\"Stella\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g\",\"caption\":\"Stella\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"imaflora, piracicaba, 2012 - Metro Arquitetos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/","og_locale":"en_US","og_type":"article","og_title":"imaflora, piracicaba, 2012 - Metro Arquitetos","og_description":"Project for a multipurpose auditorium for the Institute of Forest and Agricultural Management and Certification &#8211; Imaflora. The program consists of the construction of a new pavilion at the company&#8217;s headquarters in Piracicaba, which includes an auditorium with varying capacities, meeting rooms, and a caf\u00e9. The proposal was to organize the program within a base...","og_url":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/","og_site_name":"Metro Arquitetos","article_publisher":"https:\/\/www.facebook.com\/metroarquitetos","article_published_time":"2017-10-02T17:39:58+00:00","article_modified_time":"2024-11-22T15:08:30+00:00","og_image":[{"url":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg","type":"","width":"","height":""}],"author":"Stella","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Stella","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#article","isPartOf":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/"},"author":{"name":"Stella","@id":"https:\/\/metroarquitetos.com.br\/en\/#\/schema\/person\/018f0868a3775ee733a63ebd0eb69cd1"},"headline":"imaflora, piracicaba, 2012","datePublished":"2017-10-02T17:39:58+00:00","dateModified":"2024-11-22T15:08:30+00:00","mainEntityOfPage":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/"},"wordCount":209,"publisher":{"@id":"https:\/\/metroarquitetos.com.br\/en\/#organization"},"image":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#primaryimage"},"thumbnailUrl":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg","keywords":["am\u00e9rica do sul","brasil","institutional","piracicaba","unbuilt"],"articleSection":["Project"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/","url":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/","name":"imaflora, piracicaba, 2012 - Metro Arquitetos","isPartOf":{"@id":"https:\/\/metroarquitetos.com.br\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#primaryimage"},"image":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#primaryimage"},"thumbnailUrl":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg","datePublished":"2017-10-02T17:39:58+00:00","dateModified":"2024-11-22T15:08:30+00:00","breadcrumb":{"@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#primaryimage","url":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg","contentUrl":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2017\/10\/001-scaled.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/metroarquitetos.com.br\/en\/project\/imaflora-piracicaba-2012\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/metroarquitetos.com.br\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"imaflora, piracicaba, 2012"}]},{"@type":"WebSite","@id":"https:\/\/metroarquitetos.com.br\/en\/#website","url":"https:\/\/metroarquitetos.com.br\/en\/","name":"Metro Arquitetos","description":"Metro Arquitetos Associados \u00e9 um escrit\u00f3rio de arquitetura que desenvolve projetos em diversas escalas, de instala\u00e7\u00f5es tempor\u00e1rias a interven\u00e7\u00f5es urbanas.","publisher":{"@id":"https:\/\/metroarquitetos.com.br\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metroarquitetos.com.br\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/metroarquitetos.com.br\/en\/#organization","name":"Metro Arquitetos","url":"https:\/\/metroarquitetos.com.br\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metroarquitetos.com.br\/en\/#\/schema\/logo\/image\/","url":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2019\/03\/logotipo-metro_01.png","contentUrl":"https:\/\/metroarquitetos.com.br\/wp-content\/uploads\/2019\/03\/logotipo-metro_01.png","width":133,"height":35,"caption":"Metro Arquitetos"},"image":{"@id":"https:\/\/metroarquitetos.com.br\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/metroarquitetos","https:\/\/www.instagram.com\/metroarquitetos\/","https:\/\/www.linkedin.com\/company\/metro-arquitetos-associados\/"]},{"@type":"Person","@id":"https:\/\/metroarquitetos.com.br\/en\/#\/schema\/person\/018f0868a3775ee733a63ebd0eb69cd1","name":"Stella","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e4ed5c5470047eda4366c4a6e71261ca835d4bae85a6626af4b78d4f08a9fcbc?s=96&d=mm&r=g","caption":"Stella"}}]}},"_links":{"self":[{"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/posts\/5435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/comments?post=5435"}],"version-history":[{"count":6,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/posts\/5435\/revisions"}],"predecessor-version":[{"id":16146,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/posts\/5435\/revisions\/16146"}],"wp:attachment":[{"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/media?parent=5435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/categories?post=5435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/metroarquitetos.com.br\/en\/wp-json\/wp\/v2\/tags?post=5435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}